Construction Material List - Furuno WR2120 Installation Manual

Weather radar
Hide thumbs Also See for WR2120:
Table of Contents

Advertisement

Items
Security lock key
Maintenance tool box
PXI Screwdriver #1
SMA torque wrench
M10 x400mm threaded bolt
M10 nut
Spring clamp
Handle
*1)
Nominal length is shown which is from the length of protective tube length between ATU and SPU.
These cables have extra length for inside equipment. (e.g.: 5m cable = 5m + approx.3m) The cable
length between ATU and SPU can be selectable from 5m /10m/ 15m/ 20m (shown in nominal length).
*2)
30m protective tube will be shipped even the length of cables is 5m each between ATU and SPU. The
rest of the protective tube (20m) can be used between SPU and DPU and it should be connected
SPU tube connector for secure water proof of SPU. If it needs to extend protective tube by jointing
other protective tube, it should use weather proof silicon to glue the joint part.
Note: Mostly it will be necessary to consult to build a tower for radar installation to an expert.

2.5. Construction Material list

Local contractor/client supply
Items
1000Base-T
LAN cable
instead of UTP (Unshielded Twisted Pair).
(For Moni-con
on measure value. Incl. RJ45 STP LAN connector w/
and PXI)
cover. Refer to Appendix B for more detail.
VCTF 2sq 3core or equivalent (Recommendation is with
AC power cable
shielded). Also with crimped terminal (2sq φ4.3) for SPU
and local plug (Figure 3.2)
Please prepare a country specific power cord of
IEC60320 C13 to local plug if local outlet is using different
AC power cord
type as below.
for others
PV tube or pipe conduit (Water/Dust proof).
Protective tube
Inner diameter: φ28mm (Outer diameter: φ36.5mm)
φ28 (Water/Dust proof) when using a wall mount pull box
Tube connector
(Inner 28mm, Outer 36.5mm JIS standard)
Accessories for maintenance
For SPU box with key x2
Size: L410x150x100 [mm]
Material: SUS304.
For PXI FAM(FlexRIO Adaptor Module) replacement
0.9 N-M (8 in-lb.) for SMA 3.5mm K & V connector
Holding the radome cover up above in order to access inside
the radome when maintenance
Fix the length of threaded bolt for lifting up the radome
Holding the radome cover up above in order to access inside
the radome when maintenance
Lifting radar out/in from radome
Cables & Tube
[Signal Processing Unit --- Data Processing Unit]
Descriptions
(Must use STP (Shielded Twisted Pair)
- DPU PS attached Type-B plug
- LCD monitor attached Type-B w/ GND strap
Descriptions
Figure 2.1: Maintenance tool
Length depends
13
Qty
1
1
1
1
8
8
8
4
Length
Qty
by measure
2
by measure
1
by measure
2
by measure
1
-
2

Advertisement

Table of Contents
loading

Table of Contents