Figure 30: Main Ground Bus Location; Figure 31: Door Ground - Bottom - Oracle Tekelec 1200 Installation Manual

Hide thumbs Also See for Tekelec 1200:
Table of Contents

Advertisement

Installation
ground bar is secured to the cabinet with lugs, screws, and bolts on the right rear door flange.
Themain bus bar is attached to the right side of the cabinet on the right side of the door.

Figure 30: Main Ground Bus Location

The doors installed are grounded to the main bus through a two-hole lug ground wire and through
a screw-down latch. The rear door is grounded at the bottom of the door, the front door is grounded
at the top of the door.

Figure 31: Door Ground - Bottom

910-5681-001 Revision E, February 2014
Cabinet Installation
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tekelec 5100

Table of Contents