Daewoo B20S-2 Disassembly/Assembly page 25

Lift trucks vehicle systems
Table of Contents

Advertisement

IDCD043P
19. If the bearings were removed from the tilt
cylinder pin bores, install new ones.
IDCD027P
20. Fasten a hoist and nylon strap to secondary
cylinder (12). Install secondary cylinders (12) into
the stationary mast.
13
IDCD026P
21. Install secondary cylinder mounting brackets (13)
over the secondary cylinders.
Vehicle Systems
12
24
IDCD025P
22. Install top retainer bolts (14) for the secondary
cylinders.
13°
IDCD322S
23. Install hydraulic steel tube to each secondary
cylinder. When install the steel tube, assembling
angle should be kept as shown in above figure.
16
IDCD024P
24. Connect chains (16) at the bottom of the mast.
14
15°
Disassembly & Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents