Installation Conditions; Incoming Inspection; Preparatory Work - Reflex Fillcontrol Plus Operating Manual

Hide thumbs Also See for Fillcontrol Plus:
Table of Contents

Advertisement

6.1

Installation conditions

6.1.1

Incoming inspection

Prior to shipping, this device was carefully inspected and packed. Damages during transport cannot be excluded.
Proceed as follows:
1. Upon receipt of the goods, check the shipment for
completeness and
possible transport damage.
2.
Document any damage.
3.
Contact the forwarding agent to register your complaint.
6.2

Preparatory work

Preparing the device installation:
Frost-free, well-ventilated room.
Room temperature range: 0 °C to 45 °C.
Filling connection.
If necessary, provide a DN 15 filling connection according to DIN 1988 T 4.
Electric connection: 230 V~, 50 Hz, 16 A with upstream ELCB: Tripping current 0.03 A.
Fillcontrol Plus — 06.07.2016 - Rev. B
Installation
English — 15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fillcontrol Plus and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents