Chapter 6 Chassis Cable Installation; Chassis Cable Routing And Connection; Best Practices And Recommendations; Electrical Box Connections - Raven Hawkeye Installation Manual

For agco rogator rg900; agco rogator rg1100; agco rogator rg1300
Hide thumbs Also See for Hawkeye:
Table of Contents

Advertisement

CHAPTER
6

CHASSIS CABLE ROUTING AND CONNECTION

BEST PRACTICES AND RECOMMENDATIONS

• Do not connect battery leads until all cables are installed and connected.
• Route chassis cabling along existing cabling or plumbing to help avoid pinch points or stretching the cable
during normal equipment operation.

ELECTRICAL BOX CONNECTIONS

1. Locate the single, round connector on the supplied chassis cable (P/N 115-7303-310).
2. Route this connector to the electrical box and connect to the Hawkeye
previously.
3. Connect the chassis cable to the round receptacle on the Product Controller II ECU cable already installed in the
electrical box.
FIGURE 1. Chassis Cable Electrical Box Connection

CENTER RACK ROUTING AND BOOM CABLE CONNECTIONS

1. Route the round connectors labeled "left boom" and "right boom" toward the center rack of the machine.
2. Use the provided zip ties to secure the chassis cable to the undercarriage as necessary to avoid snagging the
cable during machine operation.
3. At the rear of the applicator tank, route the chassis cable so it follows the chemical supply lines underneath the
rear catwalk and through the center rack framework. Follow the supply lines to ensure adequate slack for
operating the center rack during field operations and when folding and unfolding the booms.
P/N 016-0171-655 Rev. D
C HASSIS CABLE INSTALLATION
C H A P T E R 6
®
bulkhead cable receptacle secured
31

Advertisement

Table of Contents
loading

Table of Contents