54/121
12.6

Preparing the switchgear room

ATTENTION
Please observe the following for room planning and switchgear installation:
➭ The dimensions of the floor openings must be according to the dimension drawing in the
switchgear documentation.
➭ The height of the cable basement must at least correspond to the cable bending radius.
➭ The pressure relief rooms must be according to the dimension drawing in the switchgear
documentation.
Possible switchgear installations:
• Wall-standing arrangement
• Free-standing arrangement (option)
For switchgear dimensions, see page 59, "Floor openings and fixing points" or the order
documents (dimension drawings, front views).
In the standard design, the pressure is relieved downwards. For further information, see page
22, "Possibilities for pressure relief".
The room dimensions result from the total width of the switchgear and the required wall
distances.
Fig. 24:
Pressure relief downwards
(standard)
*
For lined up switchgear
** Depending on national requirements. For extension or panel replacement, a control aisle of at least
1000 mm is recommended.
The minimum room height required results from the height of the switchgear and possible
top-mounted units, such as a low-voltage compartment or wiring duct.
The door dimensions depend on the
- Number of panels in a transport unit
- Design with or without low-voltage compartment
For data, see page 34, "Dimensions and weights".
Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DJH • 500-8067.9
Fig. 25:
Pressure relief with pressure relief
duct at the rear

Advertisement

Table of Contents
loading

Table of Contents