Power On Procedure - Epson T3 Series Safety And Installation

Robot system
Table of Contents

Advertisement

2.7.2 Power ON Procedure

(1)
Check the EMERGENCY connector connection.
(2)
Connect the TP bypass plug to the TP port.
(3)
Connect the power cable to the Manipulator
(4)
Connect the power cable to the power supply socket.
(5)
The PROGRAM LED blinks approximately 30 seconds after Controller starts
up normally.
If the ERROR LED is turned ON or blinking, check connection in step (1) to
(4) and turn ON the power again.
If the ERROR LED is still ON or blinking, contact the supplier in your region.
VT series Manipulator
Standard model, Cleanroom model
Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15
T series Manipulator
(Illustration: T3-401S)
LED
LED
Protection model
2. Installation
LED
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents