7.3 Re-packing of the bushing
Overview
Procedure
1.
For storage <6 months: wrap the bushing in the original protective wrapping, and replace the drying
agent.
2.
For storage >6 months: install the transport
container (1):
1.
Replace the drying agent in the transport
container (1).
2.
Install the gasket (2).
3.
Carefully put the transport container on the
bushing, and install the bolts.
3.
Lift the bushing. Refer to Lifting the bushing out of the transport box, page 17.
60
CAUTION!
Make sure that the transport container
does not cause damage to the
condenser core.
NOTE!
The transport container has to be
ordered separately.
Torque
50 Nm
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12