11.
Install the end shield:
1.
Push the end shield carefully against the
pressing ring (17).
2.
Turn the end shield approximately 20°, to its
locked position.
12.
If the transformer will be oil-filled with the
atmospheric process:
1.
Remove the hex screws (6).
2.
Put the blades of two screwdrivers in the
recesses (19) in the outer terminal (5), and
carefully push them down to lift the outer
terminal (5) straight up.
13.
The bushing is ready for oil-filling of the transformer, refer to Oil-filling, page 39.