Re-Packing Of The Bushing - ABB GOE Series Installation And Commissioning Manual

Transformer bushing
Table of Contents

Advertisement

7.3 Re-packing of the bushing

Overview
Procedure
1.
Put plastic wrap on the draw rod, and fix it to the transport box.
2.
Put plastic wrap on the upper draw rod and the support tubes.
3.
Lift the bushing. Refer to Lifting the bushing out of the transport box, page 17.
4.
Lower the bushing into the transport box.
5.
Attach the bushing to the transport box in the same way as when it was delivered.
6.
Close the transport box.
End of instruction
78
CAUTION!
Do not put the draw rod into the bushing, the threads on the draw rod will scratch the inside
of the center-tube.
CAUTION!
Make sure that the there is soft bedding in the transport box.
CAUTION!
Make sure that the oil valves and test tap does not make contact with the transport box, or
other objects.
CAUTION!
Make sure that the bushing cannot move or rotate in the transport box.
NOTE!
Refer to Lifting the transport box, page
16
and Transportation, page 15.
2750 515-1 EN, REV. 14, 2020-06-26
Installation and commissioning guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents