Checking Inspection Results - Mitsubishi Electric VS20M-11F310 Connection Manual

Melsensor, fa sensor, vision sensor
Hide thumbs Also See for VS20M-11F310:
Table of Contents

Advertisement

Checking inspection results

Check the inspection results.
1.
Check the completion of the inspection.
Ò
Ô
2.
Check the inspection results.
Ò
 Enter "D1000" for "Device Name".
 Click the [Start Monitoring] button.
 Check that the bit of 'Inspection
Ó
Completed' (D1002.9) is changed
(toggled).
 Check the following information.
• 'Job PASS' (D1015.0): This bit turns
ON when the set inspection target is
detected in the captured image.
• 'Job FAIL' (D1016.0): This bit turns
ON when the set inspection target is
not detected in the captured image.
• 'Number of jobs inspected' (D1017):
The number of times the device is
triggered is stored.
2 SLMP SCANNER CONNECTION
2.6 Checking Operations
2
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents