2. Prepare the cables with an outer cable screen for EMC bonding with the metal enclosure of
the cabinet as illustrated in Fig. 7-15.
Figure 7-15: Preparing control cables for sealing modules
(1) Sealing module
(2) Conductive foil
(3) Cable sheath removed to expose cable shield
3BHS213401 E01 REV H
1
2
3
(4) Conductor screen extension to be connected to
PE terminal
ACS1000 AIR-COOLED USER MANUAL
07 ELECTRICAL INSTALLATION
4
4
4
101/184