Download Print this page
ABB ACS350 Installation Instructions

ABB ACS350 Installation Instructions

Mul1-r3
Hide thumbs Also See for ACS350:

Advertisement

Quick Links

ACS350 and ACS150
MUL1-R3 Installation Instructions
WARNING! Before installing MUL1-R3
option, read the safety instructions and
mechanical and electrical installation
instructions in the drive user's manual.
Follow the instructions when installing,
operating and servicing the drive. If
ignored, physical injury or death may
follow, or damage may occur to the
drive, motor or driven equipment.
3. If using FPBA-01 or FCAN-01 option module, remove part
from gland box frame by bending it.
1. Fasten the gland box frame to drive with two M4×12 screws.
3
4. If control cables or fieldbus option modules will be installed,
remove the detachable lid (4) from the gland box cover.
© 2005 ABB Oy. All Rights Reserved.
1
2. Fasten the gland box frame to wall with four M4 screws (not
included).
4
5. With any fieldbus option module except FRSA-00, install the
option grounding plate to the gland box frame. See Mechanical
installation in the drive manual.
2
5
3AFE68620023 rev. B / 7.12.2005

Advertisement

loading

Summary of Contents for ABB ACS350

  • Page 1 See Mechanical from gland box frame by bending it. remove the detachable lid (4) from the gland box cover. installation in the drive manual. © 2005 ABB Oy. All Rights Reserved. 3AFE68620023 rev. B / 7.12.2005...
  • Page 2 11. Fasten the hood to wall with one M4 screw (not included). 12. Drive with MUL1-R3 option installed. ABB Oy AC Drives P.O. Box 184 FIN-00381 HELSINKI FINLAND Tel. +358 10 22 11, Fax: +358 10 22 22681, Internet: http://www.abb.com...

This manual is also suitable for:

Acs150