Operation Step; Preparation For Knitting; Preparation For Operating - Brother KE100 Motor Drive User Manual

Hide thumbs Also See for KE100 Motor Drive:
Table of Contents

Advertisement

Operation Step
o
Preparation for knitting
• Prepare the needles according to the knitting width, read the needle number of
both ends and set the operation
range by the knobs.
• Cast-on, knit several rows of waste knitting. If your knit with punch card, select
the needles and knit two rows with punch card. Then place the carriage at the
right side of needle bed.
o Select the speed change position H/L by the knob.
• Bring the shuttle to the right side and connect the coupler with the carriage.
e
Preparation for operating
•• Put on the power switch. (The left direction indicator lamp lights, in other case, check
up the row counter and yarn sensor.)
" Set the row counter.
• Set the knitting mode.
e
Operation
• Push S/S switch (Foot switch) and start the operation.
-18-

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KE100 Motor Drive and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF