GE Ettan IPGphor 3 Operating Instructions Manual page 99

Hide thumbs Also See for Ettan IPGphor 3:
Table of Contents

Advertisement

Monitor a run
Follow the instructions below to monitor the run.
Step
1
2
3
4
Ettan IPGphor 3 Operating Instructions 28-9635-51 AC
Action
Select the correct instrument selection button (Instr1 - Instr4) to select the
desired instrument. It is possible to monitor and display the progress of any
individual run from any one of four different instruments being run in parallel.
The identity of the selected instrument is shown below the instrument control
buttons.
Open the Run settings & details tab by clicking the tab heading.
In the Protocol details graph two of three possible parameters (setpoint
voltage, measured voltage and measured current) are displayed to give an
overview of the protocol and the run.
Open any of the combo boxes below the graph and then click on the desired
parameter to be displayed in the Protocol details graph.
Note:
If measured voltage and measured current are selected, the time scale
changes and only the elapsed time is shown.
5.4 Run a pre-programmed protocol from the PC
5 Operation
5.4.2 Perform a run
99

Advertisement

Table of Contents
loading

Table of Contents