Operation Verification - Keysight Technologies E8267D Installation Manual

Psg signal generators
Hide thumbs Also See for E8267D:
Table of Contents

Advertisement

Keysight PSG Signal Generators
E8257D, E8267D, and E8663D
Installation Guide
3

Operation Verification

For the instrument to meet performance specifications allow a warm up period of
45 minutes within an operational temperature range of 0 to 55 °C. For more
information, refer to the PSG signal generator Data Sheet.
Operation verification is a series of tests that, when completed, will either
ensure that the signal generator is operating correctly, or will assist in pointing
to the problem area. Operation verification does not ensure performance to
specifications, but should provide a level of confidence that the signal
generator is operating correctly within a minimum amount of time.
Operation verification is appropriate for incoming inspection after repair (when
a full calibrated performance is not required), or whenever the integrity of the
signal generator is in question. Individual tests may be performed in any order,
however, the order of the list below is recommended.
Perform the following tests for operation verification:
1.
2.
3.
Throughout this section, all references to pressing the
that the preset state is set to normal (factory-defined preset state).
To ensure that the preset state is set to normal, press
> Preset Normal User
"Performing a Self-Test" on page 24
"Checking the Maximum Leveled Power" on page 25
"Checking the Output Power" on page 29
until Normal is highlighted.
23
Preset
hardkey assume
Utility > Power On/Preset

Advertisement

Table of Contents
loading

This manual is also suitable for:

E8663dE8257d

Table of Contents