Assembly Replacement
Replacement Procedure
1. Reverse the order of the removal procedure.
2. Recommended torque for all screws is 9 in–lbs.
3. Recommended torque for all cable connectors is 9 in–lbs.
4. Replace the inner bottom rear cover and the instrument outer cover. Refer
to
5. Perform the post-repair service procedure and performance tests that
pertain to this replacement procedure, see
Procedures and Operational Performance
122
"Inner Bottom Covers" on page 101
and
"Outer Cover" on page
Chapter 4, "Post-Repair
Verification.".
Keysight Agile Signal Generator Service Guide
99.