84RT Series Speed Level™
Operating Instructions
Prestart
ART_2506 R2
ART_2507 R2
ART_2356
91857rev2– February 2013
DO NOT operate this machine until you have read and understood the Safety section of
this manual, have performed the Pre-Start Inspection, Routine Maintenance, and
Functions Test, have inspected the jobsite for hazards, and have learned the operating
procedures for this machine.
This section provides instructions for each function of machine operation. Follow all safety
rules and instructions.
This machine may be operated by trained and authorized personnel only. If multiple operators
use this machine, all must be qualified and authorized to use it. New operators must perform
a Pre-Start Inspection (see page 23) and Functions Test prior to operating the machine.
Operators must comply with employer, job site and governmental rules regarding the use of
personal protective equipment – see "Fall Protection" on page 3.
• Perform Prestart Inspection (see page 23).
• Check base control EMERGENCY STOP switch – turn clockwise to reset.
• Check platform control EMERGENCY STOP switch – turn clockwise to reset.
• Check Battery Disconnect switch in control module next to lower control box.
Must be in ON position.
Operating Instructions
Page 9