Summary of Contents for Mec Speed Level 84RT Series
Page 1
Operator’s Manual 84RT Series Speed Level™ 2684RT Serial Number Range - 12800000 - Up Part # 91857 3084RT Serial Number Range - 11800000 - Up July 2021...
Page 2
July 2021 Revision History Date Reason for Update July 2021 Updated To ANSI A92.20-2020 MEC Aerial Work Platforms 1401 S. Madera Avenue, Kerman, CA 93630 USA Toll Free: 1-877-632-5438 Phone: 1-559-842-1500 Fax: 1-559-842-1520 info@MECawp.com www.MECawp.com Page 84RT Seres Speed Level™ - Operator’s Manual...
Your MEC Aerial Work Platform has been designed, built, and tested to provide safe, dependable service. Only authorized, trained and qualified personnel shall be allowed to operate or service the machine.
For your safety and the safety of those around you, you must operate your machine as instructed in this manual. MEC designs aerial work platforms to safely and reliably position personnel, along with their necessary tools and materials, at overhead work locations. The owner/user/operator of the machine should not accept responsibility for the operation of the machine unless properly trained.
Secton 2 - Safety July 2021 Safety Alert Symbols & Fall Protection MEC manuals and decals use symbols, colors and signal words to help you recognize important safety, operation and maintenance information. RED and the word DANGER – Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury�����...
Manual and self-leveling, side/side to 14°, fore/aft to 10° Brakes Dual Rear Wheel Multi-disc Meets requirements of ANSI A92.20-2020 and CSA B354.6-2019. Speed Level™ is a trademark of MEC. *Working Height adds 6 feet (2 m) to platform height. **Weight may increase with certain options or country standards.
Secton 4 - Hazards July 2021 Electrocution Hazard Electrocution Hazard ELECTROCUTION HAZARD!!! THIS MACHINE IS NOT INSULATED! DEATH OR SERIOUS INJURY will result from contact with or inadequate clearance from any electrically charged conductor����� You must maintain a CLEARANCE OF AT LEAST 10 FEET (3����� 0 5 m) between any part of the machine, or its load, and any electrical line or apparatus carrying over 300 Volts up to 50,000 Volts�����...
Secton 4 - Hazards July 2021 Energized Conductor Contact Hazard 5000 V Max. volts Higher voltage 20000 V Min. volts 15000 V 10000 V 5000 V Lower voltage Min. volts (b) Avoid simultaneous contact across (a) Affected area areas of high potential difference CLEARANCES FROM LIVE AERIAL CONDUCTORS Spotter required...
Page 11
Secton 4 - Hazards July 2021 When working in the area of energized conductors the user shall direct and the operator shall comply with the requirements to: Stay at least 10 feet away from power lines with any part of their body, conductive object or any part of the MEWP.
ART_3071 DO NOT modify or alter the work platform without written permission from MEC, as modifications can increase weight and/or surface area resulting in instability. DO NOT place ladders or scaffolds in the platform or against any part of the machine.
Secton 4 - Hazards July 2021 Fall and Collision Hazards Fall Hazards DO NOT sit, stand or climb on the platform guard rails. Maintain a firm footing on the platform floor at all times. DO NOT exit the platform when elevated DO NOT climb down from the platform when elevated.
Secton 4 - Hazards July 2021 Additional Safety Hazards Explosion and Fire Hazards • DO NOT operate the machine in hazardous locations or locations where potentially flammable or explosive gasses or particles may be present. Damaged Machine Hazards • Conduct a thorough pre-start inspection of the machine and test all functions before each work shift to check for damage, malfunction and unauthorized modification.
Secton 5 - Jobste & Workplace Inspecton July 2021 Jobsite Inspection Jobsite Inspection DO NOT operate this machine until you have read and understood the Safety section of this manual, have performed the Pre-Start Inspection, Routine Maintenance, and Functions Test, have inspected the jobsite for hazards, and have learned the operating procedures for this machine�����...
Secton 6 - Functons Test & Operatng Instructons July 2021 Functions Test Functions Test DO NOT operate this machine until you have read and understood the Safety section of this manual, have performed the Pre-Start Inspection, Routine Maintenance, and Functions Test, have inspected the jobsite for hazards, and have learned the operating procedures for this machine�����...
Secton 6 - Functons Test & Operatng Instructons July 2021 Operating Instructions DO NOT operate this machine until you have read and understood the Safety section of this manual, have performed the Pre-Start Inspection, Routine Maintenance, and Functions Test, have inspected the jobsite for hazards, and have learned the operating procedures for this machine�����...
Page 18
Secton 6 - Functons Test & Operatng Instructons July 2021 Dual Fuel Engine Fuel selection can be made before starting the engine or while engine is running. If fuel selection is made while engine is running, only a mnor hesitation should occur. •...
Page 19
Secton 6 - Functons Test & Operatng Instructons July 2021 Dual Fuel Engine Lower Control Box: Turn the Fuel Selector Switch to the desired fuel, GASOLINE or PROPANE. ART_2410 R1 Upper Control Box: Turn the Engine Start Switch to START - release when the engine starts.
Page 20
Secton 6 - Functons Test & Operatng Instructons July 2021 Base Controls Operation and Test IMPORTANT: Be sure the area above the machine is clear of obstructions to allow full elevation of platform. Select BASE Operation • Turn the selector switch to BASE. ART_3236 Emergency Stop •...
Page 21
Secton 6 - Functons Test & Operatng Instructons July 2021 Platform Control Operation and Test IMPORTANT: Check that the route of travel to be taken is clear of persons, obstructions, debris, holes, and drop offs, and is capable of supporting the machine. Select PLATFORM Operation •...
Page 22
Secton 6 - Functons Test & Operatng Instructons July 2021 Joystick Operation Steer Proportional Joystick F o r w a R e v e r Function speed is proportional and is controlled by the movement of the L o w e r joystick.
Page 23
Secton 6 - Functons Test & Operatng Instructons July 2021 IMPORTANT: Always check front steer wheel direction before driving. Steering • Place the MODE SELECT switch in the DRIVE position. • Squeeze the Enable Bar. • Press the Steering Switch with your thumb to steer left or right. Test Operation •...
Page 24
Secton 6 - Functons Test & Operatng Instructons July 2021 Leveling Procedure Leveling of the machine can only be performed when the platform height is below the Stowed Height Limit Switch setting of approximately 10 feet (3 m). An audible alarm will sound if the platform is out of level, and then the platform must be brought to level or the LIFT function will not operate.
Page 25
Secton 6 - Functons Test & Operatng Instructons July 2021 • Turn the battery disconnect switch to the OFF position. Note: Leaving the battery disconnect switch in the ON position for an extended time will drain the battery. • Put a padlock on the battery disconnect switch to prevent unauthorized operation.
Secton 7 - Deck Extenson July 2021 Deck Extension Deck Extension 2684 Models Only The deck will extend in intervals of 8 inches (20 cm) throughout the entire 48 inch (1.2m) length of the deck extension. The extension handle hangs from the top rail at the left side of the deck extension. The handle is used to push or pull the deck extension to the desired position.
Secton 8 - Emergency Systems July 2021 Emergency Systems Emergency Systems If the control system fails while the platform is elevated, have an experienced operator use the emergency lowering procedure to safely lower the platform����� Do not attempt to climb down elevating assembly����� Emergency Stop The machine is equipped with an EMERGENCY STOP switch on both control panels.
Secton 9 - Fold Down Platform Ralngs July 2021 Fold Down Platform Railings Fold Down Platform Railings 3084 Models Open & Secure the Loading Gate • Remove the 2 snap pins that hold the loading gate to the side guardrail. •...
Page 30
Secton 9 - Fold Down Platform Ralngs July 2021 2684 Models Open & Secure The Material Loading Gate • Lift the upper Control Box off the Deck Extension Rail and place out of the way. • Lift the gate latch and swing the Material Loading Gate open.
Secton 10 - Machne Inspectons July 2021 Machine Inspections Machine Inspections DO NOT operate this machine until you have read and understood the Safety section of this manual, have performed the Pre-Start Inspection, Routine Maintenance, and Functions Test, have inspected the jobsite for hazards, and have learned the operating procedures for this machine�����...
Page 32
Secton 10 - Machne Inspectons July 2021 Immediately report to your supervisor any Defect or malfunction����� Any defect shall be repaired prior to continued use of the aerial work platform����� Inspection and maintenance should be performed by qualified personnel familiar with the equipment����� Fluid leaks under pressure may not always be visible�����...
Secton 10 - Machne Inspectons July 2021 Pre-Start Inspection Checklist The operator must conduct a thorough Pre-Start Inspection of the machine before each work shift – see “Machine Inspections” on page 27. General Inspection Checklist Check that the operator’s, safety, and responsibilities manuals are in the storage container located on the platform.
Secton 10 - Machne Inspectons July 2021 Monthly Inspection Checklist This checklist must be used at monthly intervals or every 100 hours of machine use, whichever occurs first����� Failure to do so could result in death or serious injury����� Scheduled Maintenance Inspections should be conducted by qualified service technicians only. Photocopy this page for reuse.
Secton 10 - Machne Inspectons July 2021 Quarterly Inspection Checklist This checklist must be used at quarterly intervals or every 300 hours of machine use, whichever occurs first����� Failure to do so could result in death or serious injury����� Scheduled Maintenance Inspections should be conducted by qualified service technicians only. Photocopy this page for reuse.
Secton 11 - Mantenance July 2021 Maintenance Maintenance DO NOT operate this machine until you have read and understood the Safety section of this manual, have performed the Pre-Start Inspection, Routine Maintenance, and Functions Test, have inspected the jobsite for hazards, and have learned the operating procedures for this machine�����...
Page 38
Secton 11 - Mantenance July 2021 Immediately report to your supervisor any Defect or malfunction����� Any defect shall be repaired prior to continued use of the aerial work platform����� Inspection and maintenance should be performed by qualified personnel familiar with the equipment����� Page 34 84RT Seres Speed Level™...
Secton 11 - Mantenance July 2021 Routine Maintenance IMPORTANT: The operator may perform routine maintenance only. Scheduled maintenance must be performed by qualified service technicians. Pre-Start Inspection Perform routine maintenance as identified in the Pre-Start Inspection Checklist on page 29. Scheduled Maintenance Maintenance performed monthly, quarterly, annually and bi-annually must be performed by a qualified service technician trained and authorized to perform maintenance on this machine, and must be done...
Secton 11 - Mantenance July 2021 Lubrication Operator may perform routine maintenance only. Lubrication listed as Scheduled Maintenance must be performed by a qualified service technician. ART_3085 No����� Item Specification Frequency Mobile Fluid DTE 10, DTE 13 M, or AW32 Routine Maintenance Do not substitute with lower grade Hydraulic...
Secton 13 - Decals July 2021 Decals Decals LEFT RIGHT REAR FRONT Page 41 84RT Seres Speed Level™ - Operator’s Manual...
Page 46
Secton 13 - Decals July 2021 LOCATION SAME FOR BOTH 2684RT AND 3084RT PLATFORM 2684RT PLATFORM * HAS QTY OF 10 FOR 91970 3084RT PLATFORM 33** ** HAS QTY OF 8 FOR 91970 Page 42 84RT Seres Speed Level™ - Operator’s Manual...
Obvious fluid leak or damaged component? • Wires disconnected, broken, or loose? • Motor control processor Diagnostic LED OFF? • LED should be ON. If LED is OFF or FLASHING, refer to Service Manual or contact MEC Technical Support. Lower Controls GP400 Module Terminal...
Secton 14 - Troubleshootng July 2021 Serial Plate Location The serial plate is attached to the machine at the time of manufacture. Important information about the machine is recorded on the serial plate. ART_3094 R1 Serial Plate Item Information Defined MFG YEAR Month / Year of manufacture.
MEC machinery����� Drivers are responsible for loading and securing machines, and should be properly trained and authorized to operate MEC machinery����� Drivers are also responsible for selecting the correct and appropriate trailer according to government regulations and company policy����� Drivers must ensure that the vehicle and chains are strong enough to hold the weight of the machine (see the serial number plate for machine weight)�����...
Page 51
Secton 15 - Transport and Lftng Instructons July 2021 Driving or Winching onto or off of a Transport Vehicle MEC does not recommend unassisted loading or unloading����� Always attach the machine to a winch when loading or unloading from a truck or trailer by driving�����...
Page 52
Secton 15 - Transport and Lftng Instructons July 2021 Lifting and Tie Down Instructions Only qualified riggers should rig and lift the machine����� Ensure that the crane capacity, loading surfaces and straps are sufficient to withstand the machine weight����� See the serial plate for the machine weight�����...
Page 54
MEC Parts Order Form Phone: 559-842-1523 Fax: 559-400-6723 Email: Parts@mecawp.com Please Fill Out Completely: Date: Ordered By: Account: Your Fax No����� : Bill to: Ship to: Purchase Order Number Ship VIA ** All orders MUST have a Purchase Order Number...
Page 55
MEC Aerial Platform Sales Corp. and is found upon inspection by MEC Aerial Platform Sales Corp. to be defective in material and/or workmanship. MEC Aerial Platform Sales Corp. shall not be liable for any consequential, incidental or contingent damages whatsoever.
Page 56
MEC Aerial Work Platforms 1401 S. Madera Avenue, Kerman, CA 93630 USA Toll Free: 1-877-632-5438 Phone: 1-559-842-1500 Fax: 1-559-842-1520 info@MECawp.com www.MECawp.com...
Need help?
Do you have a question about the Speed Level 84RT Series and is the answer not in the manual?
Questions and answers