START-UP CHECKLIST
This very basic fire-up sequence assumes that all wiring is correct, and solid earth ground is installed.
1. Apply power to the unit. The system runs a self-diagnostic test.
2. The unit should display a "Ready" status, indicating that it is ready to fire.
3. Ensure all ball valves are closed.
4. Verify temperatures against an analog temperature gauges.
5. Open the pilot ball valve, and start unit.
6. Confirm flame signal is adequate.
7. Visually confirm that the pilot flame safely lights the main burner.
8. Slowly open the main ball valve. Once the stack temperature has increased, the main ball valve can be
fully opened.
9. Cycle the unit off and on with all the valves open and check all shutdowns that are wired into the
PF2200.
OPERATION
For information on the operation of the PF2200-SB, refer to the Operations section of the User Guide found
here.
DOC-001041 / v1.0
36

Advertisement

loading

This manual is also suitable for:

Pf2200-sb-a