Installing
the Instrument
CAUTION:
Inspecting
the System
TA I
TMA 2940
NSTRUMENTS
Installing the Instrument
Before shipment the TMA 2940 instrument is
inspected both electrically and mechanically, so
that it is ready for operation after it has been
installed. Installation involves the following
procedures described in detail in this chapter:
•
Unpacking the instrument components and
accessory kit
•
Inspecting the system for shipping damage
and missing parts
•
Assembling the TMA
•
Connecting the TMA to the TA Instruments
controller
•
Connecting the purge gas and air line,
accessories, and power cable.
If you wish to have your instrument installed by
a TA Instruments Service Representative, call
(302) 427-4000 for an installation appointment
when you receive your instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
When you receive your TMA, look over the
instrument and shipping container carefully for
signs of shipping damage and check the parts
received against the enclosed shipping list.
If the instrument is damaged, notify the carrier
and TA Instruments immediately.
2–9