Removing The Module; Communication Cable Connection - Toshiba V Series Operation Manual

Integrated controller, control network fl-net opcn-2, module
Hide thumbs Also See for V Series:
Table of Contents

Advertisement

Chapter4 Registering Tag Variables

4.3 Removing the Module

To remove the FL312 module, turn off the power and reverse the installation procedure.

4.4 Communication Cable Connection

FL312 supports both 10BASE5 and 10BASE-T communication. Select the one appropriate
4
for your system.
・ FL312 cannot use 10BASE5 and 10BASE-T simultaneously.
・ Do not connect the unused communication cable.
・ Do not install or remove the cable while the power (controller side power and MAU power supply) is
・ When using 10BASE-T, the HUB power must be turned on before turning in the module side power
(1)
10
on.
in order to select 10BASE-T. If the module side power and HUB power are turned on in reverse
order, issue a reset request to the module until the node status GDLNK turns ON. Also, if
10BASE-T cross-cable is used to connect FL-net devices, issue reset requests to the module
repeatedly until the node status GDLNK turns ON.
• Reset request issuing timing Issue reset request
-> Monitor node status
-> GDLNK turns OFF when node status becomes standby
-> Reissue reset request
Connecting to 10BASE5
The following procedure assumes that MAU (transceiver) and AUI cable are already
setup.
1. Push up the slide switch of the 10BASE5 connector.
2. Match the direction of the AUI cable connector and the 10BASE5 connector and
connect.
3. Push down the slide switch. Check that the cable does not come loose.
FL312
Figure 4-1 AUI cable connection (10BASE5)
Caution
model 3000 FA Control Network [FL-net(OPCN-2)] FL311/FL312 Module Operation Manual
Slide switch
to MAU
AUI cable