Handover protocol for the installing company
The plant operator, and authorised acceptance officers, were present during the start-up and induction of this
system.
The plant operator/authorised acceptance officer was notified of the obligation for maintenance of the product in
accordance with the attached
user's manual.
The start-up and induction have not been carried out
The following components and/or product components were handed over to the customer:
The start-up and induction will be carried out by (company, address, contact, tel.):
The precise coordination of dates for the start-up/induction will be carried out by the plant operator and the company
performing the start-up.
Signature
Location, Date
Authorised acceptance officer
V 1.0
Handover protocol
Signature
Plant operator
59 / 60
Signature
Installing company