Place The Solvent Bottle Tray; Plumbing Connections - Gilson PLC 2050 User Manual

Purification systems
Table of Contents

Advertisement

Place the Solvent Bottle Tray

Place the solvent bottle tray on top of the system. Gripped feet allow it to stay in place. it is
designed to minimize leakage risks and avoid bottle falls.

Plumbing Connections

Inlet Tubing
inlet tubing connects the gradient valve to the solvent
reservoirs. use the two (standard) or four (optional)
inlet lines supplied. take care not to kink the inlet
tubing. each inlet line has a fitting and spring on one
end and an SS ballast on the other end.
for each inlet line, place the etfe ferrule into the
PeeK body of the gradient valve and screw on the
PeeK nut, finger tight, and slide the spring to place
its end in the knurled part of the PeeK nut. Springs
are used to prevent the tubes from bending. Colored
cable ties are provided to easily identify the tubing
(a=red, B=green, C=blue, and D=yellow).
Put the ends of the tubing with ballasts into the appropriate solvent reservoirs.
an adjustable, releasable clip on the left side of the system allows users to properly guide the
tubing into the bottles positioned on the solvent tray atop the system.
Ballast
Figure 24
inlet tubing Ballasts
36
inStaLLation | PLC 2050/2250/2500 PurifiCation SyStemS
tray
Figure 22
Solvent tray
Figure 23
Springs and Colored Cable ties
PeeK nut
Ballast
Figure 25
Close up of Ballast and fitting
tubing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plc 2250Plc 2500

Table of Contents