Installation Procedure for the Upgrade
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.

Overview of the Installation Procedure

"Step 1. Obtain a Keyword and Verify the Information."
"Step 2. Remove the Outer Cover."
"Step 3. Remove the Inner Cover."
"Step 4. Remove the Front Panel Assembly."
"Step 5. Remove Some Existing Cables."
"Step 6. Assemble the A29 and A30 Source Attenuator Assemblies."
"Step 7. Install the A29 and A30 Source Attenuator Assemblies."
"Step 8. Install the Cables."
"Step 9. Secure the Hex Nuts on the Front Panel Bulkhead Connectors."
"Step 10. Remove the Old Lower Front Panel Overlay."
"Step 11. Reinstall Front Panel Assembly."
"Step 12. Install the New Lower Front Panel Overlay."
"Step 13. Install Front Panel Jumpers."
"Step 14. Reinstall the Inner Cover."
"Step 15. Reinstall the Outer Cover."
"Step 16. Remove Option 200 License."
"Step 17. Enable Options 216."
"Step 18. Perform Post-Upgrade Adjustments and Calibration."
"Step 19. Prepare the PNA for the User."
Installation Note N5232-90101
This installation requires the removal of the analyzer's protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.