Operation; Production - Pace TF 1500 Operation And Maintenance Manual

Bga rework station
Table of Contents

Advertisement

Cover
Screws
Light
Adjustment
Knobs
6.

Operation

Note:
use to ensure the bottom side heater has reached its set temperature and stabilized.
Once the bottom side heater is at operating temperature it will deliver consistent heating,
ensuring highly repeatable heating from operation to operation.
operating properly. Also, it is important to verify the airflow of the unit with each profile to
be run.
limitations. Exceeding the limitations may interfere with the operation of the machine.
to 30mm (1.2").
limited to 15 mm (0.6").
www.paceworldwide.com
Figure 13
It is recommended that the TF 1500 be turned on for at least 15 minutes before
It is advisable to conduct a trial operation each day to ensure all systems are
Verify that the devices/parts being soldered to the PCB do not exceed the height
The maximum height of any component or device on the top of the PCB is limited
The maximum height of any component or device on the bottom of the PCB is
a. Production. Component alignment and installation – Note: If at any time you
need to abort the process mouse click on the Red "Home" button.
i.
Mouse click on Production to switch to the production screen. (Figure
6)
ii.
Select a profile.
iii.
Insert the proper vacuum pick. (Para. 5d)
iv.
Insert the proper nozzle. (Para. 5e)
v.
Place the PCB between the arms on the TF 1500 and tighten the
retention screw.
System Operations Manual
A
B
Figure 14
(Figure 15)
C
Page 19 of 38