Pace TF 1500 Operation And Maintenance Manual page 35

Bga rework station
Table of Contents

Advertisement

System Operations Manual
18. Reinstall the 4 base assembly
screws.
19. Reconnect the wires on each side
and tie them back to their mounts. Be
sure to pull the wires up taught so they
do not contact the heater.
20. Put the heater cover back on
making sure not to pinch hoses or wires.
Reinstall the 4 screws.
21. Replace the 2 rail covers.
22. Test the heater.
www.paceworldwide.com
Page 34 of 38

Advertisement

Table of Contents
loading

This manual is also suitable for:

8007-0410

Table of Contents