Position the board so the red laser sighting light is roughly in the center
of the placement site. To move the board forward and back simply
move the PCB in the arms. To move the assembly left and right push
the release handle away from you and move the assembly. Pull the
release handle towards you to secure the assembly.
Pull the camera out. (Figure 16)
Figure 16
Mouse click on the green button.
Place the component in the mounting plate on top of the camera
housing. (Figure 17a)