reduce the current stages by the value entered for Loadshed
Demand delta. The Maximum Loadshed Time is the defines
the maximum length of time that a loadshed condition is
allowed to exist. The control will disable the Redline/Loadshed
command if no Cancel command has been received within the
configured maximum loadshed time limit.
100
(38)
90
(32)
80
(27)
70
(21)
60
(15)
50
(10)
40
(4.4)
30
(-1)
20
(-7)
10
(-12)
0
(-17)
4
LEGEND
EMM — Energy Management Module
(FLUD = 2) MINIMUM
SET POINT 14 F (-10 C)
6.3
8.6
Fig. 19 — Cooling Set Point (4 to 20 mA)
Cooling Set Point (4 to 20 mA) —
based on an external 4 to 20 mA signal input to the Energy
Management Module (EMM). The signal is connected to
TB6-3,5 (+,–). Figure 19 shows how the 4 to 20 mA signal is
linearly calculated on an overall 10 F to 80 F for both Water
and Medium Temperature Brine COOLER FLUID configura-
tions. See Table 30 for configuration instructions.
(FLUD = 1) MINIMUM
SET POINT 38 F (3.3 C)
10.9
13.1
4 TO 20 mA SIGNAL TO EMM
39
Unit operation is
MAXIMUM
SET POINT
70 F (21.1 C)
15.4
17.7
20