Disassembly; Disposal; Returns; Information - GEM 553 Installation, Operating And Maintenance Instruction

Modular distribution valve, metal, dn 15-20
Table of Contents

Advertisement

Available languages

Available languages

15

Disassembly

Disassembly is performed observing
the same precautionary measures as for
installation.
Disassemble the distribution valve (see
G
chapter 12 "Assembly/ Disassembly of
spare parts").
16

Disposal

All valve parts must be
G
disposed of according to
relevant local or national
disposal regulations /
environmental protection
laws.
Pay attention to adhered
G
residual material and gas
diff usion from penetrated
media.
553
17

Returns

Clean the distribution valve.
G
Request a return delivery note from
G
GEMÜ.
Returns must be made with a completed
G
return delivery note.
If not completed, GEMÜ cannot process
credits or

repair work

but will dispose of the goods at the
operator's expense.
Note for returns:
Legal regulations for the protection
of the environment and personnel
require that the completed and
signed return delivery note
is included with the dispatch
documents. Returned goods can
be processed only when this note
is completed.
18

Information

Note on staff training:
Please contact us at the address
on the last page for staff training
information.
Should there be any doubts or
misunderstandings in the preceding text,
the German version of this document is the
authoritative document!
60 / 68

Advertisement

Chapters

Table of Contents
loading

Table of Contents