Commissioning; Inspection And Servicing - GEM 553 Installation, Operating And Maintenance Instruction

Modular distribution valve, metal, dn 15-20
Table of Contents

Advertisement

Available languages

Available languages

13

Commissioning

WARNING
Corrosive chemicals!
® Risk of caustic burns!
Check the tightness of the
G
media connections prior to
commissioning!
Use only the appropriate
G
protective gear when
performing the tightness
check.
CAUTION
Protect against leakage!
Provide precautionary measures
G
against exceeding the maximum
permitted pressures caused by
pressure surges (water hammer).
Prior to cleaning or commissioning the
plant:
Check the tightness and the function of
G
the distribution valve (close and reopen
the distribution valve).
If the plant is new rinse the piping system
G
with a fully opened distribution valve (to
remove any harmful foreign matter).
Cleaning:
The plant operator is responsible for

selecting the cleaning material and
performing the procedure.
14

Inspection and servicing

The equipment is subject to pressure!
® Risk of severe injury or death!
Only work on depressurized plant.
G
Hot plant components!
® Risk of burns!
Only work on plant that has
G
cooled down.
Servicing and maintenance work must
G
only be performed by trained personnel.
GEMÜ shall assume no liability
G
whatsoever for damages caused
by improper handling or third-party
actions.
In case of doubt, contact GEMÜ before
G
commissioning.
1. Use appropriate protective gear as
specifi ed in plant operator's guidelines.
2. Shut off plant or plant component.
3. Secure against recommissioning.
4. Depressurize the plant or plant
component.
The operator must carry out regular visual
examination of the distribution valve
dependent on the operating conditions and
the potential danger in order to prevent
leakage and damage. The distribution
valve also has to be disassembled in
corresponding intervals and checked for wear
(see chapter 12 "Assembly / disassembly of
spare parts").
Important:
Service and maintenance: Seals
degrade in the course of time. After
distribution valve disassembly /
assembly check that the operator
is fixed tightly and retighten union
nut or retaining nut a if necessary.
59 / 68
WARNING
CAUTION
CAUTION
553

Advertisement

Chapters

Table of Contents
loading

Table of Contents