Instructions On Commissioning - Festo CP-E16 Series Manual

Compact performance cp modules
Hide thumbs Also See for CP-E16 Series:
Table of Contents

Advertisement

2. Output module type CP-A08...-M12-...

2.4 Instructions on commissioning

WARNING
Please be careful when modifying the string assign-
ment at a later stage.
After saving the string assignment/hardware configu-
ration, check the address assignment of your higher-
order system before starting user programs.
You can then avoid:
– addressing errors with incorrectly installed CP
modules.
With CP field bus nodes, the new string assignment
must be saved if it has been modified (CP modules
added or removed). To do this press the SAVE button
on the node. Proceed here as described in the manual
"CP system, installation and commissioning."
With the SPC200, the new hardware configuration must
also be saved after the string assignment has been
modified. Proceed here as described in the manual for
the SPC200 or for WinPISA.
Status LED
The operating status of the output module is shown by
the status LED on the CP connection (see following
table):
CP-A08...-M12 9901b
2-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp-a08 series

Table of Contents