Preparation; Initial Inspection; Operating Environment - Agilent Technologies J2126A Installation And Verification Manual

Transmission test sets
Hide thumbs Also See for J2126A:
Table of Contents

Advertisement

2
Installation (Getting Started)

Preparation

Initial Inspection

WA RN ING

Operating Environment

32
To avoid hazardous electrical shock, do not perform electrical tests
when there are signs of shipping damage to any portion of the outer
enclosure.
Inspect the shipping container for damage.
If the shipping container or cushioning material is damaged, it
should be kept until the contents of the shipment have been
checked for completeness and the instrument has been checked
both mechanically and electrically.
Procedures for checking operation on delivery are given later in
this chapter on page 38.
If the contents of the shipment are incomplete, if there is
mechanical damage or defect, notify the nearest Agilent Office.
If the instrument does not pass the delivery checks given on
page 38, notify the nearest Agilent office.
If the shipping container is also damaged, or the cushioning
material shows signs of stress, notify the carrier as well as the
nearest Agilent office. Keep the shipping materials for the
carrier's inspection. The Agilent office will arrange for repair or
replacement without waiting for claim settlement.
DO NOT operate the product in an explosive atmosphere or in
the presence of flammable gasses or fumes.
This instrument may be operated in environments within the
following limits:
Temperature: 0 to +45 degC
Altitude: Up to 3050 m (10,000 ft)
Installation and Verification Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

J2127a

Table of Contents