Common Pneumatic Lines; Mounting The Tubing - Festo VTSA-F-CB Instructions, Assembly, Installation

Hide thumbs Also See for VTSA-F-CB:
Table of Contents

Advertisement

Installation
Line
Port designation
Working air
Working air or vacuum
2 or 4
1) Depending on the order, the valve terminal is already equipped with connections.
Tab. 9 Working ports
8.1.5.2

Common pneumatic lines

1 Valve terminal 1
2 Central pilot air exhaust line
3 Central exhaust line (3/5)
Fig. 16 Pneumatic common lines with check valves
8.1.5.3

Mounting the tubing

1. Press the tube into the tubing connection up to the stop.
2. Right end plate in size 2: first mount the tubing at port (1) and then at ports (3) and (5).
Festo — VTSA-F-CB — 2019-08
Position of the connections
in the manifold sub-bases
4 Valve terminal 2
5 Exhaust line 3/5
6 Pilot air exhaust line
Connection size
1)
Width 18 mm:
G1/8
Width 26 mm:
G1/4
Width 42 mm:
G3/8
Width 52 mm:
G1/2
25

Advertisement

Table of Contents
loading

Table of Contents