Central Post Indication Block - PERCo ST-01 Assembly And Operation Manual

Speed gate/double-sided section
Hide thumbs Also See for ST-01:
Table of Contents

Advertisement

8.9.5 Central post indication block

In order to install the central post indication block (3), proceed as follows (Fig. 22):
1. Pull the cable from central post indication block into the post top duct through the hole above
the central post.
2. Pull the cable under the jumper in the duct and connect it to LED output.
3. Install the indication block on the surface, located above the rotating support of swing panel
and using an SW4 Allen wrench fix it on the post top duct (12), using two M5×12 screws with
washers from the delivery set.
4. Check the evenness of the gap between the indications module and the swing panel cover
plate, loosen the M4×10 screws and tighten them if needed.
Remove the central post indication block in a reverse order. Disassemble the section top cover
(10) and two shielding plates prior to removal (Sect. 8.9.6, Fig. 22, Fig. 23).
Figure 22. Central post indication block installation
ST-01 Speed gate, STD-01 Double-sided section
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Std-01

Table of Contents