Power supply installation should be performed with observance of safety rules, given in its
operation manual.
7.2

Operation safety requirements

Observe general electrical safety rules when operating the speed gate.
Attention!
Do not use the speed gate in conditions that do not comply with the requirements given
in Sect. 2.
Do not use the speed gate at supply voltage that does not comply with the requirements
given in Sect. 3.
Power supply unit must be operated with observance of safety requirements mentioned in its
operational documentation.

8 INSTALLATION

Speed gate installation should be performed with observance of safety rules described in Sect. 7.1.
Speed gate installation should be carried out by, at least, two qualified professionals who have
accurately studied the following manual. Carefully study this section before the installation and
follow it thereafter.
Attention!
The manufacturer shall not be liable for any damage caused by the improper installation and
declines any claims arising thereof in case the installation is not done in compliance with the
instructions provided in this Manual.

8.1 Installation details

It is recommended:
to mount the speed gate on a steady and level concrete (grade 400 or higher, strength class
B22.5), stone or similar foundation at least 150 mm thick.
to level the foundation so that the anchoring points of the speed gate are flush with the surface
(check it with a level).
to apply reinforcing elements (450×450×200 mm) in case the speed gate is to be installed on a
less steady foundation.
Attention!
During speed gate section installation leave a 70 mm space between the section rear panel
and the wall in order to provide the possibility of central post rear panel disassembly.

8.2 Installation tools

Use the following tools during the installation:
1.21.5 kW hammer drill;
Ø16 mm hard-alloyed drill bit for anchor bolt sleeves;
floor chaser for cable raceways;
PH2 Philips screwdriver;
S17open-end and socket wrenches;
SW2, SW4, SW5 Allen wrench;
level;
measuring tape 2 m;
slide caliper.
Note:
It is allowed to use other equipment and measuring tools provided the equipment in use
ensures the required parameters and measurement accuracy.
ST-01 Speed gate, STD-01 Double-sided section