PERCo ST-01 Assembly And Operation Manual page 26

Speed gate/double-sided section
Hide thumbs Also See for ST-01:
Table of Contents

Advertisement

Note:
When it is impossible to use flexible conduit for cabling, then it is necessary to route DC and
CAN cables prior to the sections installation. These cables are located under the housing of
the Slave section central post (side of the section). To do so it is necessary to unpack the
Slave section, dismantle the housing of the central post (see Fig. 19), take out DC and CAN
cables and disconnect them from the drive control board. There are numbers on the cut-off
ends of the core that correspond to the connection layout (Fig. 18).
6.
Unpack the Master section (box №1, ST-01/M). Do not work alone! Carefully take the section
out of the box by holding it by the top duct.
7.
Unpack the section top covers (packed in a separate box).
8.
Dismantle parts of the speed gate section as described:
 Remove the central post cover plate (5) (Fig. 199, Sect. 8.9.1).
 Dismantle the front panels of both side posts (8) (Fig. 20, Sect. 8.9.2). Prior to this -
disconnect the connection cable from the front-end indication block.
9.
Install the speed gate section on the anchor sleeves. Do not work alone!
10. Route cables through the hole located in the base of the Master central post: from PS (16),
RC-panel (17), Fire Alarm device (18) and from the optional equipment. Route DC (19) and
CAN (20) cables from the Slave section (side of the section) or a flexible conduit for cabling.
11. Fix the section on the mounting surface by using eleven M10 bolts with washers. Align the
vertical position of the speed gate section with a level. Minimum angle measured from the
vertical of the section should not exceed 0.5º. It is allowed to use mounting gaskets.
Note:
Points 12-16 should be applied for STD-01 double-sided section installation.
12. Unpack and install the double-sided section. Act as described in points 7 - 9 (for both sides of
the section). Place the double-sided section so its Slave side stands towards the installed
Master section.
13. Take DC and CAN connection cables out of the central post of the double-sided section from
the Slave side (if they hadn't been routed in the cable channel earlier). Lead them through the
hole that is located on the base of the post. Route cables with a flexible conduit to the Master
section.
14. Route cables for controlling the second passage lane by using the hole located in the base
plate of the double-section central post (from the Master section side): from PS, from RC-
panel or ACS-controller, from the Fire Alarm device and from optional equipment. Route DC
(19) and CAN (20) cables from the Slave section (side of the section) or a flexible conduit for
cabling.
15. Align the vertical position of the double-sided section and fix it on the mounting surface by
using 14 M10 bolts with washers (see point 11).
16. Install other double-sided sections if needed (points 12 - 15).
17. Unpack and install the speed gate Slave section. Proceed as described in points 7 - 9.
18. Take DC and CAN cables out of the Slave section (if they hadn't been routed in the cable
channel earlier). Lead them through the hole that is located in the post base plate. Route
cables with a flexible conduit to the Master section.
19. Align the vertical position of the section and fix it on the mounting surface (see point 11).
20. Connect cables to the control board of the first passage lane according to the speed gate
electric connection layout (see Fig. 9 and Fig. 18). The control board is located in the bottom
side of the Master section central post.
Note:
DC (2) and CAN (4) cables should be connected to the X5 terminal blocks of the Master
section control board and to X1 terminal blocks of the Slave section drive board in
accordance with the conduit marking (see Fig. 18).
ST-01 Speed gate, STD-01 Double-sided section
25