Marking And Packaging; Safety Requirements; Installation Safety Requirements - PERCo ST-01 Assembly And Operation Manual

Speed gate/double-sided section
Hide thumbs Also See for ST-01:
Table of Contents

Advertisement

Assembly and Operation Manual

6 MARKING AND PACKAGING

Each speed gate section has a marking label that can be found inside the section top duct. To
access the marking label, open the section top cover (Sect. 8.9.6). The label contains trademark
and contact details of the manufacturer, section name and product serial number, date of
manufacture, power supply voltage and speed gate power input.
Speed gate Master section and double-sided section also have the label on the internal surface of
the central post cover plate (5). Remove the post cover plate to access the label (Fig. 19). The
label contains speed gate connection layout similar to the one shown in Fig. 18.
Speed gate in a standard delivery set is packed in transportation boxes, protecting it from being
damaged during transportation and storage. The number of boxes depends on the ordered
delivery set.
Transportation boxes dimensions (length × width × height):
ST-01:
Box #1 (ST-01/M section) ...........................................................................196×36×111 cm
Box #2 (ST-01/S section) ............................................................................196×36×111 cm
STD-01:
Box #1 (double-sided section)......................................................................196×36×111 cm
Box with STC-01 (set of section top covers) ......................................................197×14×24 cm
Box with ATG-300 (set of swing panels) .............................................................78×48×12 cm
Box with ATG-300H (set of swing panels) .........................................................116×48×12 cm
Box with ATG-425 (set of swing panels) .............................................................78×60×12 cm
Box with ATG-425 (set of swing panels) ...............................................................78×65×8 cm
Transportation boxes weight (gross):
ST-01:
Box #1 (ST-01/M section) ................................................................................. max 125 kg
Box #2 (ST-01/S section) .................................................................................. max 125 kg
STD-01:
Box #1 (double-sided section) ........................................................................... max 140 kg
Box with STC-01 (set of section top covers) ............................................................ max 24 kg
Box with SDC-01 (double-sided section cover) ....................................................... max 18 kg
Box with ATG-300 (set of swing panels) ................................................................. max 16 kg
Box with ATG-300H (set of swing panels) ............................................................... max 21 kg
Box with ATG-425 (set of swing panels) ................................................................. max 19 kg
Box with ATG-475 (set of swing panels) ................................................................. max 22 kg

7 SAFETY REQUIREMENTS

7.1

Installation safety requirements

Speed gate installation is to be performed by qualified personnel after careful study of this Manual
with observance of general safety rules.
Attention!
All works should be performed only after the power supply is switched off and
disconnected from the AC mains.
Only serviceable tools should be used for installation.
Sections unpackaging and relocation, section top cover and swing panels installation
are to be carried by at least two professionals.
Wearing protection gloves is obligatory! Housing details made of stainless steel may
contain sharp edges.
During the installation, before the sections are fixed to the floor, prevent them from
falling down.
Before the first speed gate power-up, make sure installation and all connections are
done properly.
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Std-01

Table of Contents