Rigging Procedures; Flying; Flying A Vertical Array - L-Acoustics A10 Owner's Manual

Table of Contents

Advertisement

Rigging procedures

Rigging procedures

Flying

Flying a vertical array

Type of deployment
Rigging accessory
Min number of operators
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Secondary safety
Use available holes on the rigging accessories to implement a secondary safety.
A10 Wide/Focus array
Procedure
1. Stack up to three enclosures.
Connect each enclosure on both sides before adding the new one.
70
own array
for A10 Wide/Focus: A10-BUMP/A10-RIGBAR
for KS21: A15-BUMP/A15-RIGBAR
2 x Ø12 mm shackle WLL 1 t (provided)
2
A10 owner's manual (EN) version 1.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents