Rigging Procedures; Rigging A Kara Ii DownLl Array Under A K1 Array - L-Acoustics KARA II DOWNFILL FOR K1 Addendum

Table of Contents

Advertisement

Rigging procedures

Rigging procedures
Rigging a Kara II downll array under a K1 array
Prerequisite
• Prepare and raise a K1 array. Refer to the K1 rigging manual.
• Prepare an array of three Kara II with 0° inter-enclosure angles.
Refer to the Kara II owner's manual.
• Position the Kara II array under the K1 array.
Make sure the latches on the bottom K1 are in storage position.
Procedure
1. Take out the four rigging arms on the top Kara II enclosure:
a) Lock the front rigging arms in linking position.
14
Kara II downll for K1 addendum (EN) version 1.0

Advertisement

Table of Contents
loading

Table of Contents