L-Acoustics A10 Owner's Manual page 93

Table of Contents

Advertisement

3. Secure another KS21 on the assembly.
Align the runners with the tracks.
4. Repeat until the stack is complete.
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
5. Disengage the brakes and position the stack at its nal position.
6. Block the stack using both brakes.
A10 owner's manual (EN) version 1.1
Rigging procedures
93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents