Rigging procedures
4. On each A10-LIFT, secure a shackle to the setup point (hole 8).
FRONT
1
2
3
4
5
Make sure the pickup points are on hole 8 before lifting the array.
5. Raise the array until the bottom rigging is accessible.
For this operation, stand behind the array.
6. Connect the enclosures at the bottom.
Pull the enclosures together to align the rigging.
7. Lower the array to select the desired pickup points.
A10-LIFT pickup point
Select the same pickup point on each A10-LIFT within an array of up to 6 enclosures.
For larger arrays, refer to
82
setup point
6
7
8
9 10 11 12 13
Radial arrays of 7 enclosures and more
(p.140).
A10 owner's manual (EN) version 1.1