Rigging procedures
Disassembly
Procedure
1. Lower the array to the ground.
2. On each A10-LIFT, move the shackle to the setup point (hole 8).
FRONT
5
1
2
3
4
Make sure the pickup points are on hole 8 before lifting the array.
3. Raise the array until the bottom rigging is accessible.
4. Disconnect the enclosures at the bottom.
Make sure all unused rigging arms are in storage position.
5. Lower the array to the ground.
84
setup point
6
7
8
9 10 11 12 13
A10 owner's manual (EN) version 1.1