Rigging procedures
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
3. Select the pickup point and raise the array.
1
2
3
4
F
FRONT
1
2
3
4
4. Add additional enclosures under the array.
a) Lower the array onto a KS21 or a stack of KS21 on KS21-CHARIOT.
Align the runners and the tracks.
b) Connect the enclosures on both sides.
c) Unlock the KS21-CHARIOT rigging arms.
74
5
6
7
8
9 10 11 12 13 14 15 16
5
6
7
8
9 10 11 12 13 14 15 16
R
A10 owner's manual (EN) version 1.1