Adding a pullback with A10-BUMP/A10-RIGBAR
Type of deployment
Rigging accessory
Min number of operators
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Assembly
Procedure
1. Prepare a vertical array as described in
2. Raise the array until the bottom enclosure is accessible.
3. Secure A10-BUMP or A10-RIGBAR under the array.
Connect A10-BUMP to the bottom enclosure on both
sides.
A10 owner's manual (EN) version 1.1
own array with pullback
A10-BUMP/A10-RIGBAR
1 x Ø12 mm shackle WLL 1 t (provided)
2
A10 Wide/Focus array
A10-BUMP
SHLAK!
(p.70).
A10-RIGBAR
Connect A10-RIGBAR to the bottom enclosure on both
sides.
Rigging procedures
SHLAK!
77