Beckman Coulter StatSpin Express 4 M510 Instructions For Use Manual page 18

Centrifuge
Table of Contents

Advertisement

Installation
Connecting the Power
2
Turn on the power switch (located on the rear panel, above the line cord connector).
3
When the instrument is ready for use, it will give a two beep signal and illuminate the
two minute cycle light on the front keypad. Press the stop button to release the latch
and open the cover.
1-2
Warning
Outside of North America: do not use the power cord supplied. Use power cord
for at least 3.0 Amp with an IEC320/CEE22 female connector and male connector
suitable for the power outlet to be used.
55-006276-001CC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents