General guidelines for commissioning
4189340703 UK
3. Commissioning of the Multi-line 2
3.1 Step by step
3.1.1 Step by step
The illustration below indicates the overall steps to be followed in order to carry out a successful commission-
ing of the Multi-line 2 unit.
Step 1
Step 2
Step 3
Step 4
Step 5
In addition, the generic troubleshooting in the chapter "Troubleshooting" can be used.
DEIF A/S
Commissioning of the Multi-line 2
Settings check
Governor check
AVR check
Protections check
Adjustment