Connecting The Cable - ABB CoreSense M10 Installation Manual

Multi-gas monitoring system
Hide thumbs Also See for CoreSense M10:
Table of Contents

Advertisement

Figure 34 Mains AC power cable configuration
LINE
NEUTrAL
EArTh
AC Live
100–240 V AC, single phase
AC Neutral
50–60 hz
8A max.
AC Earth
NOTICE
The mains power cable must be able to withstand a minimal top operating temperature
of 90 °C.

Connecting the cable

NOTICE
All terminals are properly identified in the instrument itself to simplify installation.
To connect the cable:
1 Insert the cable through the power entry port and route it under the cable guide found on the left-
hand side of the analytical unit cabinet (see Figure 35 on page 53).
Figure 35 Routing the mains power cord toward the power entry terminal block
Power
entry port
hU Live
hU Neutral
Earth
Copper-only wire
(stranded WITh FErrULE or solid)
AWG #18 to AWG #12
90 °C 600V, UL and CSA type
Flat screwdriver
Ø 6.0 mm
Flat screwdriver
Ø 3.5 mm
Connecting the CoreSense M10