ABB CoreSense M10 Installation Manual page 55

Multi-gas monitoring system
Hide thumbs Also See for CoreSense M10:
Table of Contents

Advertisement

3 Once both AC power cables are properly connected, put back the terminal block cover.
Figure 38 Putting back the terminal block cover
4 Tighten the screws that hold the terminal block cover.
Figure 39 Tightening the two screws holding the terminal block cover
55
Connecting the CoreSense M10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents