—
Figure 15 Analytical unit installation template
Screw holes (×8)
3 With a drill powerful enough, and appropriate drill bits, drill the eight screw holes.
4 Screw in the four mounting posts as shown below (screws, washers and lock washers not provided).
—
Figure 16 Installing a mounting post
28
Installation Guide